Unplugged Practice Test / Explanations / Logical Reasoning Set 1, Question 3

Unplugged Practice Test: Logical Reasoning Set 1, Question 3 (Necessary Assumption)

Logical Reasoning  ·  Type: Necessary Assumption  ·  Logical Reasoning Set 1, Question 3 of 25

Taking the test? Finish it first. This page shows the answer.

The answer is (A). The argument leans on one gap: no other power-intensive business ever ran in Corrand, and any spare grid capacity would have pulled one in. That only proves Verlin generated its own power if a data center couldn't have run there on grid power alone once the grid had nothing spare left.
Key takeaways
  • Necessary Assumption questions ask for the unstated premise the argument depends on.
  • Try the negation test. If negating a choice wrecks the argument, that choice is the necessary assumption.
  • Every question on this test is original, written to the same logical skeletons as real questions, and Steve checked every one himself before release.

The question

The Verlin data center operated in the Corrand district for 6 years, during a period when the surrounding region suffered chronic electricity shortages. People lived and worked in Corrand throughout those years, but no other power-intensive business ever operated in the district. Any unallocated grid capacity in Corrand would have drawn such businesses to the district. So the company that owned the Verlin center must have generated the center's electricity itself, and that company was therefore not solely a provider of data services.

3. Which one of the following is an assumption on which the argument depends?

  1. (A)Unless its owner generates its electricity, a data center is unlikely to operate in a district that has no unallocated grid capacity.
  2. (B)With access to on-site generation, other power-intensive businesses could have operated in the Corrand district.
  3. (C)A data center whose owner generates its electricity consumes less power than a comparably sized data center drawing from a grid.
  4. (D)Building on-site generation is one of the first steps a company must take when it expands from data services into the sale of electricity.
  5. (E)No company that generates its own electricity also draws electricity from a public grid.
Steve's walkthrough

AWhy (A) is correct

The argument leans on one gap: no other power-intensive business ever ran in Corrand, and any spare grid capacity would have pulled one in. That only proves Verlin generated its own power if a data center couldn't have run there on grid power alone once the grid had nothing spare left. (A) supplies exactly that: unless its owner generates its own electricity, a data center is unlikely to operate where there's no unallocated capacity. Since Corrand plainly had none to spare, Verlin's 6 years of operation only make sense if its owner built its own generation.

Why the other answers are wrong

Common questions

What type of question is this?

Necessary Assumption. Necessary Assumption questions ask for the unstated premise the argument depends on.

How do I get better at Necessary Assumption questions?

Try the negation test. If negating a choice wrecks the argument, that choice is the necessary assumption. The free LSAT cheat sheet lists the wrong-answer patterns to watch for on every type.

Want another Necessary Assumption question? Drill them free, 1 at a time. You get the explanation the second you answer. Drill Necessary Assumption questions
Want a coach to walk you through questions like this one? Book your free LSAT tutoring lesson
Steve Schwartz, LSAT coach
These explanations were written by Steve Schwartz, LSAT Coach and Founder of LSAT Unplugged. I've been coaching the LSAT since 2005. Cited by Reuters, Law.com, the Wall Street Journal, the New York Times, The Atlantic, U.S. News, the ABA Journal, and Above the Law.
Updated September 30, 2026.